Site-specific SWMS, written for your work. Ready for site.
SWMS for high-risk construction work, written around your actual tasks, plant and site, in the head contractor's format if required. Typically ready in 2 to 5 business days.
SWMS rejected? Site start at risk?
Under Australian WHS laws, a SWMS is required before high-risk construction work starts. Head contractors check them closely, and generic templates with the wrong tasks, hazards or plant are routinely sent back. We write yours around the work your team will actually do, ready for review before the job starts.
Who this is for
- Your business is carrying out high-risk construction work and needs a SWMS.
- A principal contractor has asked for a task-specific SWMS before site work starts.
- Your existing document does not reflect the work sequence, equipment or site conditions.
- You need to review a SWMS after the task, work environment or controls change.
Common high-risk construction work
Examples include:
- Work where a person could fall more than 2 metres
- Excavation, trenches or shafts deeper than 1.5 metres
- Work on or near energised electrical installations
- Work in or near confined spaces
- Work on or next to roads or rail with traffic
- Work involving powered mobile plant
- Demolition, or disturbing asbestos
Not sure if your work is high-risk? Ask us. Check the applicable WHS rules for your state or territory.
What you get.
A task-specific document your team can review, brief and use on site.
- A site-specific SWMS for each high-risk task
- Step-by-step work sequence with hazards for each step
- Controls using the hierarchy of control, with responsibilities
- Worker sign-on, briefing and review sections
- Editable Word plus PDF, in your format or the head contractor's template
How it works.
Tell us about the work
Tasks, site, plant, crew and start date, plus any head contractor template or site rules.
We draft the SWMS
Work steps, hazards and controls, written for the actual job.
Your supervisor reviews it
Check it matches how the crew will do the work. We make any changes.
Brief the crew and start work
Workers sign on, and the SWMS stays on site for the job.
Why Optimax.
SWMS that head contractors accept, and crews can actually follow.
- Written for your job, not downloaded. Your tasks, plant, site and crew, not someone else's template.
- Fast turnaround. Typically 2 to 5 business days, with urgent options for site starts.
- Head contractor formats. We work in their template if they require one.
- Part of a bigger system. SWMS that align with your ISO 45001 system and risk registers, or run digitally as job safety analyses in Optimax Comply.
The practical details.
When is a SWMS required?
Before any high-risk construction work starts, such as work at heights over 2 metres, deep excavation or work near energised electrical installations. The full list is in the WHS Regulations for your state or territory.
Can you prepare a SWMS without visiting the site?
Yes, in most cases. We work from your task details, plant list, site rules and photos. Your supervisor checks it against the site before work starts.
Who is responsible for the SWMS?
Your business, as the PCBU doing the work. We prepare it; your supervisor reviews it, briefs the crew and keeps it current on site.
Can we use one SWMS for several projects?
Often, yes, as a base. If the work is similar, we prepare a master SWMS that's quickly adapted for each new site's conditions and head contractor requirements.
What should we send to get a quote?
The tasks, the site or project, how many SWMS you need, any head contractor template, and your start date.
How long does it take?
Typically 2 to 5 business days. Tell us your start date, and we'll prioritise urgent site starts.
Can you do several SWMS at once?
Yes. Many contractors need a full set for their regular high-risk tasks. Ask about pricing for multiple SWMS.